11:15 Observation
VOICE NOTE Leaving area check

Water Management

North Wall

Southern end sump is dug out, grader working on spoon drain. Should be finished by end of shift ready for sump pump move.

Planned inspections Open 4

South wall done. Sump done. ROM face deferred. Crusher conveyor deferred.

Grade control Blend plan

Current blend 7.2 kt @ 0.86%. Need 4.8 kt from Stockpile 5 by 16:00.